Emergency Flow Change on the Trinity River 7-26-2018

Emergency Flow Change on the Trinity River 7-26-2018

Due to the Carr fire, the Carr Powerhouse is shut down. Releases from Lewiston Dam on 7/26/2018 increased from the summer base flow as follows:

10 am: from 450 cfs to 550 cfs

12 noon: from 550 cfs to 750 cfs.

Check water levels before entering the river at trrp.net

Comments are closed.